BIM4H Fire Alarm and Fire Detector System GuidanceBy Richard Freer
Below are recommendations that we, as BIM4Housing, are putting forward as the findings of our Alarm and Fire Detector System experts. We do not claim these findings to be definitive, but we would hope that they would provide ‘accountable’ and ‘responsible’ persons with some of the detail they would require to ensure that risks are mitigated.
Format
The structure of this set of information is designed to be consumed in various ways by different stakeholder groups doing different things. Therefore, information mentioned in one section may be repeated in another, so they can be applied to a particular activity.
Also, we have sought to organize the information to make it more machine-readable so, although the lists could be reduced by combining similar items, this would make them less easily used in applications.
Despite the need to edit and contextualise, we have tried to retain the authentic voice of our experts throughout. This is especially so in the Appendices, where no colloquialism is left unturned.
Terms of use
This document is not intended as an end-result, but as a snapshot of a dynamic, on-going piece of work being developed by Subject Matter Experts who represent the different interest groups.
We hope it is helpful but is not definitive because, as we have learned from our collaboration, no one knows everything. It should therefore be used to supplement other sources of information, all of which should be validated by a responsible person applying it to a project.
Comments and additional contributions are welcome and a panel of volunteer experts will review suggestions to assess/validate them and augment the guidance as required.
It will be available for free at www.bim4housing.com but should not be printed and used offline, because the information may be updated and be no longer valid.
INTRODUCTION
Structure
We have six Working Groups of experts who understand the individual Stakeholder needs of Development, Design, Construction, Manufacturing, Operations and the specialist Advisors who support the whole process. Each Working Group determines the problems they are experiencing that could be alleviated by better information, often from a different Stakeholder group and they collectively establish Workstreams to collaborate and share knowledge to come up with practical solutions.
They have established Workstreams for MMC, Data Standardisation, Sustainability and Fire Safety and the latter has, in turn, established Round Table workshops that bring together SMEs who really understand specific asset types.
(See Appendix 1 for Structure Diagram)
Fire Safety Methodology
It was determined to take individual fire-critical assets and examine impacts and influences through their lifecycle. A series of online discussions were held, along with one-on-one calls and an email gathering of views and inputs. This culminated in a series of Roundtable discussions, each with a clear focus and targeted output. BIM4Housing’s expert team was enhanced by guests from the GTI, along with other fire safety specialists throughout.
Phase 1 defined the over-arching questions that need to be answered, for each asset type, to deliver the BIM-plus solution necessary to the effective functioning of the Golden Thread in terms of Fire Safety.
The questions defined are:
- What risks does the asset mitigate?
- To what risks is the asset, itself, susceptible?
- What information is needed about an asset, to ensure it performs as required?
- What tasks/method statements/procedures are required to ensure the asset is installed, commissioned, inspected, and maintained properly?
- What level of competency/training needs to be in place?
- How should product changes be recorded?
Phase 2 sought to answer those questions, offering a definitive guide to the delivery of The Golden Thread through the effective management of required information.
Phase 3 seeks to build on our ongoing learning and experience and include further assets in our process.
Fire Alarm and Fire detector system Methodology
The output from a Roundtable (20th September 2021) was collated and contextualized and combined with further subject matter expert input. Significant participant engagement was achieved prior to the event. The resulting report was then peer-reviewed.
What is a Fire Alarm and Fire Detector system?
Approved document B, Fire Safety, Volume 2, Buildings other than dwelling houses (2019 edition), defines a fire alarm system as a: '...combination of components for giving an audible and/or other perceptible warning of fire.'
Live investigations of false fire alarms, published by BRE in December 2015, suggests that a Fire Detection and Fire Alarm System is ‘…control equipment that utilises detectors, warning devices and other components to detect fires and provide warning.’
Most fire detection and alarm systems operate on the same basic principles. If a fire is detected, then an alarm is triggered. This warns building managers and occupants that there may be a fire and that evacuation may be necessary. Some systems include remote signalling equipment which can alert the fire brigade or a remote monitoring centre.
Fire can be detected by; heat detectors, flame detectors, smoke detectors, carbon monoxide detectors and multi sensor detectors, or an alarm can be triggered at manual call points. Alarms may consist of bells, sirens, horns, lights or a combination these. Two power supplies are required, generally a mains supply and batteries providing 24 hours back up.
It is important that a thorough assessment of need is undertaken before a fire detection and alarm system is designed or purchased.
In the UK, fire alarm systems are categorised as:
L, (L1 to L5): automatic systems intended for the protection of life.
M: manual systems, fitted with sounders and call points.
P, (P1 and P2): automatic systems intended for the protection of property.
Fire detection and alarm systems can be divided into a number of general types:
- Conventional systems.
- Addressable systems.
- Analogue addressable systems.
- Wireless systems.
- Self-contained units.
Conventional systems generally consist of a series of detectors and call points wired to a control panel which drives the detectors and a minimum of two sounder circuits, includes LED indicators and allows de-activation and resetting. Typically, separate circuits will be provided for each fire 'zone' (usually a floor of a building or a fire compartment). This separation into zones means that the approximate location of the fire is known and so the appropriate response can be instigated. It also allows for easier diagnosis of faults.
Addressable systems are similar to conventional systems, but the central control panel can identify exactly which detector or call point triggered the alarm (rather than just a zone), or whether communication has been lost with a detector. In this system the circuit is wired in a loop, with a number of detectors or call points on each loop. The loop can be powered from both ends, so that it continues to function even if there is a break in the loop (separate loops may still be provided for each zone).
The control panel can be programmed to show specific information or trigger specific responses for different detectors within the system. Addressable systems are generally used for larger or more complex installations because of the benefits of more accurate detection, and so fault finding, and the reduced wiring requirement.
Analogue addressable systems, or intelligent systems can include an analytical capability in each detector which can assess local parameters to determine whether there is a fire, a fault or a maintenance requirement. This can be useful in preventing the occurrence of false alarms. A pre-alarm warning may be indicated if a detector is approaching a trigger condition.
Wireless fire alarm systems connect detectors and call-points to the control panel using wireless signals.
Self-contained fire alarm units are generally only suitable for small installations. They consist of a single unit, including break glass contact, sounder, power supply, battery and charger.
FINDINGS
It was determined to look to ‘codify’ risks to enable teams to coalesce around tackling a problem, run scenarios to simulate what might happen and how collaboration can reduce the risk of them happening.
Two other GTI Working Groups, H&S and Standards, have been working with NBS to extend Uniclass to carry a more detailed set of risks and, those identified here, can form part of that.
Clearly, it is not desirable for the ‘Accountable Person’ to be absolved of responsibility for not anticipating a risk, simply because it was not on the list of suggested risks- which should be considered a ‘steer’ not an absolute. However, without that list, it becomes impossible to define and deliver the information needed.
What are the component elements of Fire detection and Fire Alarm Systems?
- Fire alarm control panel
- Associated relays/accessories
- Fire detectors:
- Manual call points
- Point detectors:
- Heat
- Smoke
- Carbon Monoxide
- multisensor variants
- Optical/multidetector
- Aspirating air sampling very early smoke detectors
- Linear heat detectors
- Beam detectors
- Video detectors
- Wireless Detection
- Fire alarm devices:
- Wireless alarms
- sounders & voice sounders
- visual fire alarm devices
- vibrating devices
- voice alarm systems
- Remote signalling
- Fire resistant cables- type
- FP200 & enhanced, FP400, FP600 rating from 30min – 2h
- interfaces between fire detection and fire alarm systems with ancillary systems and equipment
- remote data extraction
- evacuation alert systems for use by fire and rescue services in buildings containing flats
- Public address systems
- containment and support system
- Sounders, VADs, or voice alarms.
- CIE (control and indicating equipment)
- Fitting of protective covers on MCPs (manual call points).
Are there any dependencies on other systems?
- Emergency lighting
- Escape and anti-panic
- Security CCTV
- Door Access control
- Mechanical Ventilation
- Natural gas supply cut-off
- Lifts
- Communication – red care (tele care)
- Sprinklers
- Automatically Opening Vents and Smoke Control systems
- Electrical supply
- Electrical generator backup
Q1a. What risks does a Fire detection and Fire Alarm System mitigate?
- Failure to detect fire early
- Panic and confusion allowing early safe evacuation
- Property loss
- Loss of life
Q 1b. To what risks are Fire detection and Fire Alarm Systems, themselves, susceptible?
- Incorrect initial design
- Lack of weekly user tests
- Lack of six-monthly maintenance
- Changes to layout e.g., splitting rooms so automatic detection is not correctly sited
- False alarms
- Poorly designed cause and effect at the outset
- unintended operation
- difficulty in safe evacuation
- Inconsistency in design
- Residential Building - Cause & Effect when fire/smoke detected in communal area – Tennant’s within the Flats are being told to Stay put or elsewhere to evacuate – no consistency
- Residential Building - Disconnect between common parts and residential areas detection systems
- Often there is no connection for early warning
- Vandalism
- Detectors being muted or left in test
- Removal of detectors
- Covering over detectors
- Painting over detectors
- Incorrect location of detectors
- Change of layout/use without modification of detector location
- Failure to communicate with other systems (e.g. interfaces with automatic vents, smoke vents, ventilation)
- Fireman lift including programming of lift position and provision of a secondary power supply
- Power failure
- Incorrect dB levels
- Associated relays/accessories
- Incorrect sensor/sensitivity setting
- Cause and effects are not well documented or understood
- Moving a large metal object may alter the radio environment and disrupt communications (e.g. Scaffolding).
- Overcrowded corridors (furniture, rubbish etc.)
- Inadequate earthing and protection against shock from exposed metal parts
- Occupancy levels of a building
- Breaking (or displacing) the glass on an MCP
Q2. What information is needed about Fire detection and Fire Alarm systems to ensure they perform as required?
- Cause and effect matrix and description of operation
- Location of interfaces
- Location of control and indication panel(s) inc x,y coordinates.
- Location of manual call points for user tests
- Location of detectors inc x,y coordinates.
- Contact details of maintenance contractor and call-out response time
- Manufacturer
- Model number
- Installer
- Commissioner
- basic system information to residents and tenants
- Ratings of the various cabling in the system
- Zone details
- The battery backup or life safety supply
- Clear evacuation and alarm plan
- Software version
- Setting of sound pressure levels of the system sounders (dB levels recorded)
- life cycle of components
- Location of Deaf Alerter systems and any vibrating pillars etc inc x,y coordinates.
- What standards the system complies with
- Category and level of system design e. Property, Life, Manual
- Grade of system design as per BS 5839-6 2019
- Identification of high-risk areas
- Fire strategy. Including, position of extinguishers, position of exit signage (illuminated and photoluminescent)
- what certification & date of certification
- Electrical power and secondary supply sources
- Types and location of notification e.g. flashing lights
- Location and DB test of refuge areas
- Volume dispersal and reach where communal alarms are concerned for a stay put policy for internal flats
- The riser strategy when vertical becomes horizontal.
- The detection strategy changes. i.e. detection at every level inside the cupboard.
- Approval by the authorities for the configuration of alarm zones
- Siting of Control And Indicating Equipment (CIE)
- Design, Installation, and commissioning certificates of the system
- Agreed variations on the original system design specifications
- System events, e.g., Fire alarm / fault signals, routine maintenance visits.
- Certificate of acceptance
- A model verification certificate, that can be sued to confirm compliance with the recommendations of BS 5839-1
Q3. What tasks are required to ensure Fire detection and Fire Alarm are installed, commissioned, inspected, and maintained properly?
(It should be a given that any work on fire safety critical assets should always be undertaken by competent people, probably 3rd party accredited. However, that person must be supported with any information that they might need to reduce the risk of an important step being missed and to provide an auditable record of what tasks were completed. This is common practice in M&E maintenance, where the industry has developed a significant library of standard procedures and tasks lists, along with roles/competency required.
An air-conditioning unit is maintained by a qualified air conditioning engineer, but the engineer is also issued with a check list for them to record what was done.
A similar industry-wide check list for installation, commissioning, handover, maintenance and recycling could be agreed.)
BS 5839-6:2019 Provides the details for Fire detection and fire alarm systems for buildings. Code of practice for the design, installation, commissioning and maintenance of fire detection and fire alarm systems in domestic premises (+A1:2020)
Installed:
As per BS 5389 and in line with manufacturers specifications for their equipment.
Consider the requirement to have 15lux in an event of emergency (emergency lighting) near Fire Fighting equipment. Location of such equipment should be established early and included in fire strategy, including illuminated and photoluminescent exit signage
The installer should ensure that all control, indicating and power supply equipment that is likely to need routine attention for maintenance is sited in readily accessible locations that facilitate safe maintenance access
Documentation and information including system drawings are completed reflecting as built status.
Commissioned:
Test of the full cause and effects
Sound pressure levels recorded in all areas
User training and system handover completed
Entire system should conform to the requirements of BS 7671, issue certificate of compliance and completion – independent verification if required
Issue a certificate for the electrical supply
Log book is issued
Maintained:
Weekly user test
Monthly standby supply verification checks
6 monthly inspections and tests
12 monthly inspections and tests
The user should record all faults or damage in the system logbook and should arrange for repair to be carried out as soon as possible.
Industry-standard maintenance instructions – extract from BESA’s SFG20.
Addressable Fire Alarm System
Smoke Detector
Gas Detector
Q4. What level of competency/training needs to be in place?
(Industry training courses are vital, but they must be complemented by additional knowledge-transfer from people with many years real experience.
Individual manufacturers have product-specific training which complements the more general training. Such training resources need to be provided in all cases where a product is used – both for new build but also as part of the long-term H&S/O&M information, ideally held as machine-readable data in the Asset information model to ensure maintenance teams have easy access to critical information.)
Installation
- Those involved in the design and installation should be able to demonstrate training /qualifications relevant to the systems they design/install and be members of a recognised organisation with accreditation through the likes of
- Competency of individual installers demonstrated through certification with a suitable 3rd party accreditation provider. This should include the provision of the manufacturer’s fitting instructions
- Specification of which third party accreditations are acceptable
- BAFE SP203 for commercial fire alarms
- Electrical Certificates to be as the current version BS 7671 or as amended
- SDI19 for smoke control systems
- BAFE SP207 for evacuation alert systems
- Domestic fire - Qualified Electrician NAPIT, SELECT etc.
- Aico Expert Installer training
- Installer should have manufacturer-led product-specific installation training, in addition to any formal UKAS accreditation.
- Manufacturers should offer installation training, either in their own right, or sub-contracted out to a specialist to provide that service
- code of practice should include training materials
- Organisational acceptance for compliance of the installation.
Maintenance
- Building Safety Managers - Competency training. BSI Flex 8670 focuses on the competence of individuals and expects that organisations use this core criteria as part of their management of competency (planning, monitoring, reviewing etc.). This also enables the capture of the skills, knowledge, experience, and behaviours necessary to the undertaking of a defined role, function, activity or task.
- Manufacturer-specific installation, commissioning, inspection, maintenance/repair, replacement and recycling requirements should be retained to inform future maintainers of the manufacturers’ recommendations.
- Mandatory awareness training should be in place for all people working on site and carrying out maintenance in buildings
- Training for the operational team should be required on Standards (BS, CEN etc) plus to give a basic understanding of how to read drawings, commissioning certs and O&M’s
- Fire Risk Assessment (FRA) be carried out by a competent person to identify areas of high fire risk
Testing
- Voice alarms should be tested weekly in line with BS 5839-8
- Operate one MCP during normal working hours at approximately the same time each week
- Additional tests at least once a month for any staff who are not usually present during the weekly test
- A different MCP to be tested each week so that all tested over time
- The alarm should not sound for more than a one minute so that the occupants can distinguish between tests and a real fire alarm
- If the standby power supply includes an automatically started emergency generator, this should be tested every month
- If the standby power supply has vented batteries, these should be inspected visually. Also, all vented batteries and their connections should be examined every three months by a person competent in battery technology
Q5. How are the changes from one product to another recorded?
(If information is not updated, it isn’t information anymore. It is misleading and, possibly, down-right dangerous. If the systems and processes to keep information current are not trusted, then the value of even correct information is compromised.
Robust Change Management requires an information baseline against which the different states – current, proposed, final and ongoing change – can be measured and reported.
The baseline information should contain the required performance in a machine-readable/actionable form and the Change Management process should enable that to be compared with:
- the actual performance of the designed solution (probably generic)
- the performance of the chosen product against the generic
- the performance of an alternative (value engineered?) product
- the record of what was used/installed.)
Requirements and Suggestions
- A schedule of safety critical elements for the building, to include products specified
- Baseline against which to compare proposed alternative products (Some designers have expressed reluctance to propose (not specify) a specific manufactured product that will satisfy their design due to liability, procurement rules and fees)
- This schedule would be “Locked” at a specific design stage, after which changes to products specified should not occur except for exceptional reasons
- A formal change management system is required to ensure that any unavoidable changes are validated by a ‘responsible’ person e.g. original designer and/or fire engineer
- There is a well-established change management process in construction called Technical Submissions in which requested changes from the specifications/recommendations, that were created by the designers (and selected manufacturers), need to be formally reviewed and approved. Design-and-Build procurement has affected that process and it should be re-established in a way that the performance of a proposed product, and its constituent components, is easily compared with the proposed alternative and, if agreed, it is recorded as a Technical Deviation
- Validation of changes would include verifying that the new product met all the requirements for the application with no detriment to the overall design, the details of which should be recorded (Changes in the product may be made between design and procurement, procurement and installation, handover and ongoing maintenance)
- Listed as a part of draft Building Safety Case content is Cost .v. Quality with Evidence of Competency
- More onus needs to be made by the client to ensure collation of Information Requirements and the updating of design models into ‘as installed’ content suitable for Asset/Facilities Management. Compliance systems should be informed with the information from the AIM
- Full Disclosure of the product is needed at handover so that after Work Stage 7, if a manufacturer goes out of business or products change the record is there in perpetuity
- Asset database must be kept up to date with core data for new installs. Installation documents should be held in a centralised digital location. Once BIM/COBie level data is manageable within the asset management system then this will be used as the main source of data. . Asset tagging (barcode) systems and processes should be considered as forming part of the change management process.
- Procurement should be included in the process, recording what was purchased and feeding that into the BIM process to locate where they were installed, or which products they are replacing.
- BIM, CAFM, Asset and Housing management systems must inform the change management process. The asset information needs to enable comparison but the original performance spec of the dry or wet riser and the related information such as Fire Strategy and Cause and Effect should form part of that Technical Deviation process. The FMs must be able to update the Asset Information Model with machine-readable data of the newly installed product
- H&S files for each building (cradle to grave) must be supplied, recorded and be updated with notification of changes and the implications.
- Warranty information of the existing and the proposed products should be provided to allow proper consideration to be made on the selection of an alternative or replacement. If a product has a shorter life than another, this information should be available to inform selection. Given some of the products will be in locations that are difficult to locate, the longevity of a product could have safety implications.
- Specification or design brief for the business (performance and or product) should be recorded in a machine-readable format to enable validation against the Golden Thread.
- Recording who has worked on/replaced the component and their entitlement/competence to do so
- Evidence that the component’s performance in relation to the part it plays in the system has been considered and is warranted
- Evidence of commissioning – cause & effect at completion
- Evidence of re-commissioning – cause and effect after change
- Cause and effect check list
- Use of the fire logbook to capture changes.
APPENDIX 1
BIM4Housing Structure
APPENDIX 2
Comply with BS 5839-8
Section 7: User’s responsibilities
43 Premises management
43.1 Commentary
The user needs to appoint a single, named member of the premises management to supervise all matters pertaining to the fire detection and fire alarm system. The role of this person is to ensure that the system is tested and morn trained in accordance with the recommendations of this part of BS 5839, that appropriate records are kept and the I relevant occupants in the protected premises are aware of their roles and responsibilities in connection with the fire detection and fire alarm system. This person also needs to ensure that necessary steps are taken to avoid situations that are detrimental to the standard of protection afforded by the system and to ensure that the level of false alarms is minimized.
43.2 Recommendations
A single, named member of the premises management should be appointed to supervise all matters pertaining to the fire detection and fire alarm system.
This person should normally be the keeper of the documentation as described in Clause 40, and should be given sufficient authority to carry out the following duties.
- Ensuring that the CIE is checked at least once every 24 h to confirm that there are no faults on the system.
- Ensuring that arrangements are in place for testing and maintenance of the system in accordance with Section 6 of this standard.
- Ensuring that the system logbook (see Clause 48) is kept up-to-date and is available for inspection by any authorized person (e.g. representatives of enforcing authorities and property insurers).
- Ensuring that all relevant occupants of the protected premises are instructed in the proper use of the system.
Particular care should be taken to ensure that relevant occupants are able to interpret fire, pre-alarm (see 47.3) and fault indications, and that they are adequately familiar with the appropriate controls, including those associated with initiation of fire alarm signals, silencing of fire alarm signals and resetting the system.
It should also be ensured that all occupants are aware of the measures necessary to avoid the generation of false alarms.
Relevant occupants should also be instructed in the facilities for disablement and the circumstances in which they should, and should not, be used.
In premises in multiple occupation, it should be ensured that sufficient representatives of each occupier are instructed.
NOTE 1 Different levels of instruction might be necessary for different occupants.
- Ensuring that appropriate action is taken to limit the rate of false alarms [see 30.2g), 30.2h) and 35.2.7.3].
- Ensuring that a clear space of at least S00 mm is preserved in all directions around and below every fire detector, and that all manual call points remain unobstructed and conspicuous.
- Establishing a liaison between those responsible for changes in, or maintenance of, the building fabric (including redecoration, etc.) to ensure that the work does not unnecessarily compromise the protection afforded by the system, create system faults or cause false alarms (see Section 3). If structural or occupancy changes occur or are planned, it should be ensured that any necessary changes to the fire alarm system are considered at an early stage.
- Ensuring that, when changes are made to the system, record drawings and operating instructions, supplied in accordance with 40.2b) and TO.2c j respectively, are updated.
- Ensuring that, where necessary, a suitable zone plan is displayed and is kept up-to-date [see 23.2.2e)].
- Ensuring that the following spare parts are held within the premises:
- six frangible elements and appropriate tools for manual call points, unless there are less than twelve manual call points in the protected premises, in which case only two spare frangible elements with appropriate tools need be held; and
- such other spare parts agreed between the user and the organization responsible for servicing the system.
NOTE 2 It would be of value for the premises management to be aware of the policy of the relevant fire and rescue service with regard to response to calls from the premises and/or any ARC, in the event of operation of the fire detection and fire alarm system.
43.3 Action in the event of pre-alarms
A pre-alarm can be a response to a slow growing fire or to indicate detector contamination. Whatever the reason, the following actions should be taken:
- determine and thoroughly inspect the area from whence the pre-alarm has originated;
- if a fire is discovered, carry out the predetermined fire routine; and
- if no fire is discovered, record the events or activities near the suspect detector in the logbook and, if there is need for work to be undertaken on the fire detection and fire alarm system, inform the maintenance company.
44 Logbook
44.1 Commentary
A logbook needs to be kept for the purpose of recording all events that occur in respect of the system, including fire signals, fault signals and work on the system. This information can be of value to the organization that services the system and if special action is taken to address false alarm problems. The logbook might provide evidence of compliance with certain fire safety legislation (such as the Regulatory Reform {Fire Safety) Order 2005 [12], the Fire (Scotland) Act 2005 [13], the Fire Safety {Scotland) Regulations 2006 [14], the Fire and Rescue Services {Northern Ireland) Order 2006 [lS] and the Fire Safety Re9ulations (Northern Ireland) 2010 [16]).
44.2 Recommendations
NOTE 1 A model format for a logbook is contained in Annex F.
The following information should be recorded in the logbook:
- the name(s) of the member(s) of the premises management to whom responsibility for the fire detection and fire alarm system is delegated;
- brief details of maintenance arrangements;
- dates and times of all fire alarm signals (regardless of whether the signal is a false alarm or is initiated as the result of a test, fire drill or genuine fire); if the fire alarm signal has resulted from the operation of a manual call point or fire detector, the device and its location should be recorded;
- causes, circumstances surrounding and category of all false alarms (see Section 3);
- dates, times and types of all tests;
- dates, times and types of all faults and defects; and
- dates and types of all maintenance (e.g. service visit or non-routine attention).
NOTE 2 The logbook may be kept in electronic form but needs to be accessible for all interested parties.
BS EN 54-1 Fire detection and fire alarm systems - Introduction
BS EN 54-2 Control and indicating equipment
BS EN 54-3 Fire Alarm Sounders
BS EN 54-4 Power supplies
BS EN 54-5 Point Heat Detectors
BS EN 54-7 Point Smoke Detectors
BS EN 54-10 Point flame detectors
BS EN 54-11 Manual Call Points
BS EN 54-12 Line fire detectors
BS EN 54-13 Compatibility
BS EN 54-14 Installation (BS 5839-8 in UK)
BS EN 54-16 Voice Alarm Control & Indicating Equipment
BS EN 54-17 Short circuit isolators
BS EN 54-18 Input Output Units
BS EN 54-20 Aspirating smoke detectors
BS EN 54-21 Alarm and Fault Routing
BS EN 54-22 Resettable Line heat detectors
BS EN 54-23 visual alarm devices
BS EN 54-24 Loudspeakers
BS EN 54-25 Components using radio links
BS EN 54-26 CO Detectors
BS EN 54-27 Duct Detectors
BS EN 54-28 Non-resettable line-type heat detectors
BS EN 54-29 smoke & heat multisensor point fire detector
BS EN 54-30 CO & Heat multisensor point fire detector
BS EN 54-31 smoke, CO (and heat) multisensor point fire detector
APPENDIX 3
(For detectors)
How about we follow the BSI Fire. Vocabulary BS 4422:2005
3.313
fire detection system
system by which an alarm of fire initiated by a fire detector is given automatically at a central control panel
Be very wary of anything closed protocol!
3.282
fire alarm system
combination of components for giving an audible and/or other perceptible alarm of fire
Closed protocol weakens your procurement strategy and achieving best value.
APPENDIX 4
Participants
Andrew Scott C-Tec
Debbie Dynamic Knowledge
George Stevenson ActivePlan
Gordon Rolfe Platinum Property Management
Ian Doncaster Fire And Smoke Solutions Ltd
Jack White Clarion
Jarek Wityk Winter Electrical
Joanna Harris Sodexo
Luke Hazelwood L&Q
Paul McSoley Mace
Paul Oakley ActivePlan
Paul Wooldridge Haringey
Pauline Tuitt L&Q
Philip Wroot Hydrock
Tina Mistry Aico
APPENDIX 5
A Summary of BS 5839-1 (2017)
BS 5839-1:2017 Fire detection and fire alarm systems for buildings – Part 1: Code of practice for design, installation, commissioning and maintenance of systems in non-domestic premises
Writer’s notes
1 The term ‘premises management’ is used to describe the individual or organisation that is responsible for the premises rather than ‘responsible person’ (which has a legal meaning) or building safety manager (which doesn’t yet formally exist).
2 Codes of practice are not intended to be prescriptive and so include recommendations rather than requirements. However, this does not mean that the recommendations can be ignored, and variations need to be justified and formally agreed with relevant people.
3 BS 5839-1 Clause 7, Variations from the recommendations of this standard, describes how variations should be handled. However, in practice, installers tend not to include variations, no matter how sensible, because:
Someone has to take responsibility, and this is rarely forthcoming.
Variations may be used as an excuse to withhold payment.
4 Text in BS 5839-1 in italics is explanatory commentary and does not make recommendations – hence some odd phrases are used to avoid saying ‘should’.
5 Fire alarms for dwellings are covered in BS 5839-6, but this does not include the common areas of general needs blocks of flats. These areas are not dwellings and so are within the scope of BS 5839-1.
6 Voice alarm systems, which are a type of fire alarm that is normally connected to a fire detection system, are covered by BS 5839-8.
7 Emergency voice communication systems, which are two-way speech systems for use by firefighters or for management to communicate with people in refuges, are covered by BS 5839-9.
8 Evacuation alert systems for residential buildings, which are a fire alarm for use only by the fire and rescue service as a last resort, and do not incorporate manual call points or automatic fire detectors, are covered by BS 8629.
When are fire detection and fire alarm systems needed?
The Foreword says “national building regulations[1] require fire detection and fire alarm systems to be installed in many buildings at the time of construction. In addition, legislation requires that, where necessary to safeguard relevant persons in case of fire, existing premises are equipped with "appropriate fire detection and fire alarm systems””.
There are several references to residential care premises but there is no mention of general needs residential buildings, so it is not clear exactly what equipment, if any, should be installed in common areas of residential buildings[2].
Annex A, Choice of appropriate category of fire detection and fire alarm system, lists types of non-domestic premises including places of work such as shops, offices, factories and warehouses; hotels, schools, hospitals; places of assembly such as cinemas, theatres and churches; residential care homes, shopping centres, etc. Absence from the list does not mean that a fire detection and fire alarm system is not needed.
In all cases, a fire risk assessment should be carried out to determine whether a fire detection and fire alarm system is required and, if so, what type of system to install.
What are fire detection and fire alarm systems?
Fire detection and fire alarm systems range from manually operated systems with no automatic detection, through to sophisticated, digitally controlled networks. BS 5839-1, which also applies to extensions and alterations to existing systems says: "the term fire detection and fire alarm systems ... includes systems that range from those comprising only one or two manual call points and sounders to complex networked systems that incorporate a large number of automatic fire detectors, manual call points and sounders, connected to numerous inter-communicating control and indicating panels".
Clause 3 is a list of definitions, from "addressable system" to "zone plan".
Clause 4, Need for a fire detection and fire alarm system and type of system, gives guidance on whether a fire alarm is needed and clause 5, Categories of system talks about the different types of coverage for life protection (M for manual and L for automatic) and property protection (P) systems needed for different types of premises. It is OK for a system to use a mixture of categories to achieve the necessary outcome.
Category L and M - Life Protection
Category M
Category M systems rely on humans to operate manual call points (MCPs) and are useful for places where occupants are likely to notice a fire quickly, or where automatic fire detection would not be reliable, such as workshops. All Category M installations need fire alarm devices such as sounders and visual alarm devices (VADs), to warn people who may be present.
Example of a manual call point
Category L
Category L systems are designed to protect life and so focus on installing automatic fire detectors in escape routes and areas with a high fire risk. There are five categories, L4 gives the least cover and L1 gives total cover. L5 is an ‘engineered’ solution designed to suit specific risks. Category L installations should have fire alarm devices such as sounders, VADs, or voice alarms throughout the building regardless of the requirements for detection devices.
Example of a sounder VAD (beacon)
Category L4
Category L4 has MCPs throughout the building and at all final exits and automatic fire detection (AFD) in all escape routes, including stairwells.
A typical optical smoke detector
Category L3
L4 plus AFD in all rooms, corridors and compartments that open onto escape routes.
Category L2
L3 plus specified areas of high fire hazard level and/or high fire risk.
Category L1
L1 recommend MCPs and AFD throughout the entire premises. Care should be taken to choose the detector types according to not only the fire risks in each room, but also the persons at risk. For example, heat detectors should not be the primary detector type in bedrooms as they will not provide quick enough warning to protect the occupant's life.
Category L5
Category L5 is used to meet special fire safety objectives, often in variation to the recommendations of BS 5839-1. In common areas of residential buildings this might mean omitting MCPs due a perceived risk of misuse.
Category L5/M
This is a combination of a category M system (MCPs and fire alarm devices throughout) with AFD or other specialised systems with the intention of protecting life in specific areas.
Category P - Property Protection
Although intended to protect property, most Category P systems will provide some protection for life and will be used in addition to Category L requirements. Category P systems are usually provided in response to assessments made by insurance companies.
Category P1
P1 is intended to protect the entire building, and thus requires AFD throughout the premises. However, it is focused on the protection of property so alarm devices (sounders, VADs, voice alarms, etc) are only required where people are likely to be present such as a manned office.
Category P1/M
This means that a full Category M system should be combined with a full Category P1 system and there should be AFD, MCPs, and alarm devices throughout the building.
Category P2
Category P2 uses AFDs in high-risk areas only and are commonly used when combining with a life protection system other than Category M. For example, a building may have L3 protection for escape routes and adjoining rooms, with additional AFD in a server room that is not directly connected to an escape route.
Category P2/M
AFDs as specified for P2 with MCPs and alarm devices throughout the building as per a Category M installation.
SECTION 2, Design considerations
The main design considerations for a fire detection and fire alarm system
Section 2 covers the design process from defining the system category and its fire safety requirements to electrical earthing. Each clause is presented in a clear and easy to follow format, with a commentary on each design aspect, followed by a list of recommendations.
This is a very basic guide so here are important topics.
System type
The commentary in 8.1.1, says " The appropriate extent of automatic fire detection is normally determined by a fire risk assessment, rather than a rigid application of system category to every building of a specific type or occupancy.
System components
It is important that system components, e.g., MCPs, automatic fire detectors, sounders, control and indicating equipment (CIE) and other devices conform to relevant British Standards or are third-party certified to the EN 54 series of European Standards.
Monitoring, integrity and reliability of circuits external to control equipment
The design should limit the effect of faults or maintenance work. A fault (but not fire) signal needs to be given at the CIE in the event of any failure in a critical signal path, which comprises all the components and interconnections between every manual or automatic fire alarm initiation point and the input terminals of each fire alarm device, as well as transmission equipment within the premises for routing of signals to an Alarm Receiving Centre (ARC).
Detection zones
Sub-dividing a building into detection zones of MCPs and / or AFDs, is recommended for all but the smallest premises. This ensures that those responding to a fire alarm are directed to the location of the fire.
Alarm zones
Most premises have a simple ‘one-out all-out’ evacuation procedure in the event of fire. When an MCP or AFD is activated, an alarm sounds throughout the building to warn everyone to leave. However, in more complex buildings a phased evacuation policy might be appropriate, in which case separate alarm zones will be required. In this case it is recommended that the boundaries of every alarm zone are of fire-resisting construction. As this means that people in some parts of the building will not hear the alarm unless the fire spreads the configuration of alarm zones might require approval by the authorities.
Communication with the fire and rescue service
If fire breaks out it is important that the fire and rescue service is alerted as quickly as possible. Depending on the category of system this can be achieved manually via a telephone call or automatically via a 24-hour manned alarm receiving centre. Category M and category L systems are acceptable in buildings without sleeping accommodation, but category L systems in buildings with sleeping accommodation and category P are likely to benefit from automatic transmission of alarm signals.
Strangely, power supplies, cable types and cable routing for alarm routing equipment that do not comply with BS 5839-1 need not be regarded as a variation in the minimum standby battery capacity and any cable(s) between the CIE and the alarm routing equipment must conform to the recommendations.
Fire alarm devices
It is essential that alarm signals can warn all those for whom they are intended. In some situations, e.g., in noisy spaces or in spaces where people with impaired a hearing will often be alone, such as toilets and hotel bedrooms, it may be necessary to supplement the audible alarm with a flashing light from a VAD, although it is not normally recommended that only a visual alert is used.
In sleeping accommodation such as residential care homes, additional tactile alarm devices that can be placed under pillows or mattresses may also be appropriate. The Standard also gives recommendations relating to portable equipment (pagers) carried by staff or hearing-impaired occupants, usually controlled by radio.
A typical vibrating “pillow pad”
Manual call points
MCPs need to be prominently sited, easily distinguishable from non-fire alarm call points, and distributed so that it is not possible to leave the floor or building without passing one. They should also be enough to ensure that the time between the discovery of a fire and the alarm being sounded is as short as possible. Breaking (or displacing) the glass on an MCP should result in an alarm signal being sent to the CIE immediately, although protective covers may be fitted.
Types of fire detector and their selection
Automatic fire detectors detect one or more of the four main components of a fire, which are: heat, smoke, carbon monoxide; and infrared and / or ultraviolet radiation from flames.
Multi-sensor fire detectors are increasingly available and contain more than one sensor type, each of which responds to a different characteristic of fire. Signals from Multisensors can be analysed by algorithms so that, for instance, a smoke detector will normally be relatively insensitive and so avoid false alarms. However, if the temperature is increasing, the smoke sensitivity is also increased, and a fire alarm signal will be sent very quickly. It is important to make sure that multisensors are certified to the relevant EN 54 standards, which are:
BS EN 54-29 smoke & heat multisensor point fire detector
BS EN 54-30 CO & Heat multisensor point fire detector
BS EN 54-31 smoke, CO (and heat) multisensor point fire detector
Example of a fire detector and fire alarm device comprising smoke, heat and carbon monoxide detection with an alarm sounder and visual alarm device.
The choice of AFD for each space is governed by three main considerations: the speed of response required, as determined by the fire risk assessment and fire safety objectives; the need to minimize false alarms; and the nature of fire hazard. Other issues such as cost and maintenance requirements may also be significant. It is important that all factors are considered at the design stage as no one type of fire detector is suitable for all applications.
The spacing and siting of fire automatic fire detectors is very technical and is covered in detail in sub-section 22.
Control and indicating equipment (CIE); networked systems
The CIE, which is normally installed in an entrance lobby where it can be accessed by the FRS, performs the following main functions: supply of power and automatic monitoring and control of external circuits external; indication of fire and fault signals and their location; and manual controls to enable actions such as routine testing and resetting the system.
In networked systems, the functions of the CIE are distributed amongst several "sub-panels" that are located around the building and interconnected by means of a network. Some sub-panels may only act "repeat indicators", while others may be fully functional control and indicating panels that will continue to operate normally even if the communications link between the sub-panels fails
The rest of Section 2 covers topics such as power supplies; cables, wiring, radio-linked systems and electromagnetic compatibility with other equipment such as mobile phones. The final clause (29) concerns electrical earths with attention drawn to maintenance issues and the need to ensure the adequate earthing and protection against shock from exposed metal parts.
The main installation issues
Fire alarms are electrical systems that need to be connected to the mains electricity supply by an electrician who can issue an electrical safety certificate. According to the IET, an electrician is generally someone who has completed an apprenticeship and holds a Level 3 technical and vocational qualification or Level 3 Diploma.
However, there are no legal requirements for installers of fire alarms to have any formal qualifications, but there are several schemes for demonstrating competence that will help responsible clients ensure that work is of an acceptable standard, such as BAFE SP203.
Limiting false alarms
It is vital that MCPs or AFDs are sited so that the possibility of false alarms is limited as much as possible: for example, smoke detectors should never be fitted in kitchens (cooking fumes) or bathrooms (steam). Clause 21, Types of fire detector and their selection, describes the fundamental design considerations when using point AFDs and optical beam smoke detectors, and offers an example of the issues that might be picked up and flagged to the designer or end user at the installation stage.
BS 5839-1 makes it clear that, unless the installer is also the designer, "the identification of design shortcomings is not generally the responsibility of an installer", however, best practice is that "if the installer is aware of such shortcomings, particularly those arising from features of the building that might not have been known to the designer, they be drawn to the attention of the designer, user or purchaser".
Responsibility for compliance
It is important that, before the installation of a fire detection and fire alarm system starts, one organisation accepts responsibility for compliance of the installation. This is emphasised because more than one organisation may be involved from design through to installation, commissioning and handover.
For example, following the risk assessment, a designer may specify the system for quotation. The successful bidder is likely to be a main electrical contractor, who may sub-contract the work to a specialist fire alarm contractor, who may, in turn, employ sub-contractors for running cables. In this case, it is likely that the specialist fire alarm contractor will accept the responsibility and issue the relevant certificates
What happens once the installation is complete?
Commissioning
Commissioning involves testing the installation for compliance with BS 5839-1 and the specification. This should be carried out by a "competent person", who possesses the relevant current training, experience and capability to perform the task in accordance with all the relevant drawings and reference materials.
The purpose of commissioning is to ensure the installation was carried out and that the system operates correctly as designed, and that, for example, the audibility of the sounders is acceptable.
Documentation
Adequate records and other documents must be provided to purchaser of the fire detection and fire alarm system. It is particularly important to include accurate "as-fitted" drawings and operation and maintenance manuals describing operational details of the system. Also, design, installation and commissioning certificates and records of any agreed variations from the design specification.
A logbook should be provided for the user to record all system events, such as weekly tests, fire alarm and fault signals, routine maintenance visits, etc. Annex F gives an example of the layout of an acceptable logbook.
Certification
Once a system has been commissioned, certificates must be provided for design, installation and commissioning. Certification can be carried out more than one organisation but, "it is essential that the person who signs these certificates is competent to verify whether the recommendations of this Standard in respect of the process to which the certificate refers have, or have not, been satisfied". Annex G gives examples of model certificates.
Following satisfactory certification, the system should be formally handed over to the purchaser. At this point, the organisation that has accepted responsibility for the system should issue a certificate of acceptance for the purchaser to complete.
On large or complex installations, the purchaser may commission an optional independent check of the system, in which case Annex G also includes a model verification certificate, that can be sued to confirm compliance with the recommendations of BS 5839-1.
Once the handover has been completed, responsibility for the day-to-day running and maintenance of the system passes to the premises management, which is covered by Section 6, Maintenance.
Maintenance
Regardless of the system’s built-in fault monitoring, this cannot be relied on to ensure that a fire detection and fire alarm system will always be fully operational and that no changes have taken place to the building that will prevent this happening.
There are three main reasons for routine maintenance and testing
- To identify any faults and make sure they are rectified
- To ensure there have been no major failures of the system
- To familiarise occupants of the building with the fire alarm signal(s)
It is important that the premises management to institutes set up a schedule of weekly and monthly tests, and record them in the logbook (Annex F).
Weekly user tests
- Operate one MCP during normal working hours at approximately the same time each week
- Additional tests at least once a month for any staff who are not usually present during the weekly test
- A different MCP to be tested each week so that all tested over time.
- The alarm should not sound for more than a one minute so that the occupants can distinguish between tests and a real fire alarm.
Voice alarms should be tested weekly in line with BS 5839-8, which recommends that, because the meaning of a voice alarm is very clear, it is likely that occupants will respond in less than a minute, weekly tests should be done out of hours with one test every three months when the building is occupied.
Monthly user tests
- If the standby power supply includes an automatically started emergency generator, this should be tested every month
- If the standby power supply has vented batteries, these should be inspected visually. Also, all vented batteries and their connections should be examined every three months by a person competent in battery technology
Inspection and servicing by a specialist
It is important that regular inspection and servicing of is carried out to identify and rectify any faults, including causes of false alarms. The user should be notified of any changes made to the building such as extensions, alterations, or remedial work that might affect the fire alarm. Changes in use and or occupancy levels can also alter the effectiveness of the fire alarm so this must also be considered.
Inspection and servicing visits should not be more than six months apart and failure to implement this recommendation will result in the system no longer being compliant with BS 5839-1, with no allowance for variation.
Because of the specialist nature of the work, inspections are usually contracted out to a fire alarm service organisation, whose competence can be assured by third-party certification such as BAFE SP203.
Functions included in the periodic inspection and testing of the system include an examination of the logbook including following up on any recorded faults, and a visual inspection of all the MCPs, AFDs and fire alarm devices, Clause 45.3 gives recommendations for periodic system inspection and testing as well as some annual tasks. As this is a labour-intensive, some elements can be spread over two or more service visits during each twelve-month period.
Clause 45.3 also recommends that all types of detectors be tested in such a way that the stimulus they are designed to measure (normally smoke) passes into each detector and is detected. This is normally done with a special test ‘pole’ that injects a tiny amount of stimulus into the detector.
Clause 45.4.j. gives recommendations for the testing of multi-sensor detectors.
There are several recommendations related to non-routine attention to the fire alarm. These range from the appointment of a new servicing organisation, which will need a special inspection of the system, through fault repair and system modifications to inspection and test of the system following a fire.
User's responsibilities and premises management
Fire detection and fire alarm system are intended to protect life and or property and so it is essential that maintenance, inspection and testing of are carried out on a regular, scheduled basis.
This is a complex process that can involve several different parties, so BS 5839-1 recommends that the system user appoints "a single, named member of the premises management to supervise all matters pertaining to the fire detection and fire alarm system". This places responsibility firmly in the hands of one individual whose role is "to ensure that the system is tested and maintained in accordance with the recommendations of this part [Section 7: User's responsibilities] of BS 5839”.
These responsibilities include: the keeping the system records and relevant documents, ensuring that occupants of the protected premises are aware of any role or responsibility assigned to them in respect of the fire detection and fire alarm system; and that the system itself is protected from any development that might negatively affect the standard of protection or contribute to false alarms.
The logbook is important and should contain details of the person responsible for the fire detection and fire alarm system and a record of all events, whether scheduled or not, such as tests, routine maintenance visits, fault signals, alarm signals, etc). This information can be invaluable to whoever services the system and might also provide evidence of compliance with fire safety legislation, should the need arise.
List of EN 54 product standards
BS EN 54-1 Fire detection and fire alarm systems - Introduction
BS EN 54-2 Control and indicating equipment
BS EN 54-3 Fire Alarm Sounders
BS EN 54-4 Power supplies
BS EN 54-5 Point Heat Detectors
BS EN 54-7 Point Smoke Detectors
BS EN 54-10 Point flame detectors
BS EN 54-11 Manual Call Points
BS EN 54-12 Line fire detectors
BS EN 54-13 Compatibility
BS EN 54-14 Installation (BS 5839-1 in UK)
BS EN 54-16 Voice Alarm Control & Indicating Equipment
BS EN 54-17 Short circuit isolators
BS EN 54-18 Input Output Units
BS EN 54-20 Aspirating smoke detectors
BS EN 54-21 Alarm and Fault Routing
BS EN 54-22 Resettable Line heat detectors
BS EN 54-23 visual alarm devices
BS EN 54-24 Loudspeakers
BS EN 54-25 Components using radio links
BS EN 54-26 CO Detectors
BS EN 54-27 Duct Detectors
BS EN 54-28 Non-resettable line-type heat detectors
BS EN 54-29 smoke & heat multisensor point fire detector
BS EN 54-30 CO & Heat multisensor point fire detector
BS EN 54-31 smoke, CO (and heat) multisensor point fire detector
Disclaimer
This guide is an overview of the main recommendations of BS 5839-1 2017, and, of necessity, a lot of detail is missing so it must not be relied on. If you need to understand details of the standard, a copy can be bought from the BSI https://shop.bsigroup.com.